Strategy
Financial models
Built to be stress-tested, not to be admired.
- Build cost
- Absorption (sales pace)
- Rental yield
- Exit

What you receive
Most advisory ends with a PDF. Ours ends with the working material — the things that took us a full development cycle, and several expensive lessons, to produce.
The kit
Seven sets of working documents, from the first model to the rental operation.
Strategy
Built to be stress-tested, not to be admired.
Structure
The options open to you, mapped per market.

Build · Design
Complete design sets for villa types that have been built and commercially sold. You can tender them as they are, or adapt them to your plot and your market.
Build · Tender
The document that makes three contractors answer the same question. Without it, comparing quotes is guesswork.
Build · Selection
The criteria that actually predict a bad build, weighted into a comparison grid.
Sales
How the local agency network is structured, who really places buyers, what commission moves them, what materials they need — and how to become the project they show first.
Operations
The standards for handover and after — including the reporting that tells you early when an asset is drifting.
Which of these you receive depends on the programme and the stage your project is at.
See what each programme includes →The same model applies to boutique hotels and resort projects: we scope the deliverables to the asset during the qualification call.
Management tools
Five instruments, one set of data. Below, the rental performance view for a portfolio of eight delivered villas.
| Villa | Occupancy | Nightly rate (units) | Net yield |
|---|---|---|---|
| V1 | 78% | 360 | 8.4% |
| V2 | 75% | 340 | 7.9% |
| V3 | 81% | 385 | 9.1% |
| V4 | 69% | 300 | 6.8% |
| V5 | 72% | 330 | 7.4% |
| V6 | 64% | 280 | 6.2% |
| V7 | 70% | 315 | 7.2% |
| V8 | 75% | 330 | 7.8% |
| Mean | 73% | 330 | 7.6% |
Illustrative data — the figures show the format of the report, not the results of any project.
Ownership
Every document produced for you remains yours.
No licence · No expiry · No lock-in

Start a project
A short brief, then a call. If the project is not one we can move forward, we will say so on that call rather than in the third meeting.
Request a call →